nacra5.2 002
"new" NACRA 5.2
Date: 12/27/2009
Views: 1428
|
nacra5.2 005
"new" NACRA 5.2
Date: 12/27/2009
Views: 1431
|
nacra5.2 008
"new" NACRA 5.2
Date: 12/27/2009
Views: 1697
|
nacra5.2 009
"new" NACRA 5.2
Date: 12/27/2009
Views: 1120
|
P1090844
Date: 01/09/2010
Views: 978
|
P1280915
Date: 01/28/2010
Views: 996
|
P1280916
Date: 01/28/2010
Views: 930
|
P3010941
Date: 03/01/2010
Views: 987
|
mast step
Mast base
Date: 01/28/2010
Views: 920
|
P1090864
inside hull..forward beam strap...rear outside bolt
Date: 01/09/2010
Views: 947
|
P1090863
inside hull..forward beam strap...rear inside bolt
Date: 01/09/2010
Views: 1029
|
P1090866
inside starboard hull looking back toward stern...daggerbaord visible
Date: 01/09/2010
Views: 973
|
inside forward
Inside hull looking toward bow
Date: 01/09/2010
Views: 922
|
P1090868
inside hull looking from stern at forward bulkhead
Date: 01/09/2010
Views: 985
|
dirty hull
Date: 01/28/2010
Views: 907
|
clean hull
Date: 03/01/2010
Views: 933
|
dirty hull2
Date: 01/28/2010
Views: 930
|
clean hull2
Date: 03/01/2010
Views: 971
|
P1090832
starboard front beam strap damage
Date: 01/09/2010
Views: 1012
|
P1090833
Date: 01/09/2010
Views: 930
|
P1090834
Date: 01/09/2010
Views: 1046
|
P1090860
inside hull/front beam strap damage of previous repair (rotted wood support)
Date: 01/09/2010
Views: 942
|
P1090861
inside hull/front beam strap damage of previous repair (rotted wood support)
Date: 01/09/2010
Views: 1047
|
repair1
front beam strap damage after dremel and sanding
Date: 04/11/2010
Views: 1075
|
repair7
corner epoxied and ready for fiberglass
Date: 04/11/2010
Views: 994
|
repair5
corner epoxied and ready for fiberglass
Date: 04/11/2010
Views: 984
|
support
steel support strap ready for installation
Date: 04/12/2010
Views: 978
|
repair2
steel support in place inside starboard hull forward of front beam
Date: 04/11/2010
Views: 945
|
repair4
steel support in place inside starboard hull forward of front beam..inside wall
Date: 04/11/2010
Views: 953
|
front corner
front beam damage after fiberglass and sanding..beginning to paint
Date: 04/12/2010
Views: 924
|
back corner
starboard rear damage at beam strap with beam removed
Date: 04/16/2010
Views: 995
|
backcorner2
starboard rear beam after dremel and sanding
Date: 04/16/2010
Views: 933
|
rearbeam5
rear beam strap epoxied and ready for fiberglass
Date: 05/22/2010
Views: 882
|
N5.2
mast up and rigged for 1st time!
Date: 05/23/2010
Views: 1064
|
N5.2 shadow
mast up and rigged for 1st time!
Date: 05/23/2010
Views: 922
|
tramp
pic of tramp after initial rigging
Date: 05/23/2010
Views: 1335
|
nacra diagram
Date: 01/29/2010
Views: 2220
|
1st sail1
1st test sail in light wind "uni". Power lines look closer than actual.
Date: 05/31/2010
Views: 1063
|
tiller2
tiller connection
Date: 03/01/2010
Views: 966
|
tramp-edit
Tramp with arrows to jib clew and splice
Date: 07/30/2010
Views: 1019
|
hull num
Hull #
Date: 01/09/2010
Views: 942
|
web-5
side view
Date: 03/01/2010
Views: 1026
|
sail-edit
batten end
Date: 08/16/2010
Views: 966
|
shackle
shackle
Date: 08/26/2010
Views: 1030
|
at dock
at dock
Date: 08/26/2010
Views: 919
|
IMG_0626
Date: 09/08/2010
Views: 914
|
hobie2
Date: 06/22/2011
Views: 912
|
fiddle block
fiddle block for trapeze
Date: 09/07/2011
Views: 917
|
paint 007
Newly painted hulls
Date: 05/14/2012
Views: 789
|
paint
Paint used
Date: 05/15/2012
Views: 821
|
webnacra
dirty hull
Date: 05/15/2012
Views: 812
|
2012 sail92
Date: 07/23/2012
Views: 858
|
xmas sail 009
Xmas Nacra
Date: 12/17/2012
Views: 1113
|
|
|
|