[quote=lakewateree]I've redone a couple SC 20's and a couple SC17's. Tom's help was invaluable, great company and guy.
When I redid the last 20 he also told me he didn't like using rivets, so I went with his advice and drilled and tapped everything. Think my last count was nearing 75 drilled and tapped screws.... On that 20 I went from the wire traveler to the track, great upgrade but a pain. Part of the problem was the beam was 12ft, so the track was 8ft or more! Per Tom I installed a backing plate inside the beam for the track. That was a major pain to do. I had to not only drill/tap the beam but the backing plate as well.[/quote]
No HTML tags allowed (except inside [code][/code] tags)