[quote=beachsailor][img]http://myweb.tiscali.co.uk/gansg/9-loads/c-type.jpg[/img]
the basic crane design(lift, swing, lower) Fig 1. or the barge crane(fig 3) would work. I thing fig 3 would be a easier because you could support the top of the fixed pole with guide wires.[/quote]
No HTML tags allowed (except inside [code][/code] tags)