Login
Albums Beachcats Technical Rebuild of NACRA 5.2 This End UP Aluminum Refinishing, Rigging Modifications and Everything Connected to the Aluminum.
Search All Albums

Aluminum Refinishing, Rigging Modifications and Everything Connected to the Aluminum.

Cleaning up, sandblasting, precoating, priming and finishing aluminum mast, beams and boom. Riveting and structural work.

Date: 06/10/2016
Owner: Dave Graf
Size: 52 items
first previous
20160801_171533

20160801_171533

Mast Base

Date: 08/01/2016
Views: 491
20160808_111747

20160808_111747

Pretty rudder castings

Date: 08/09/2016
Views: 513
20160808_152311

20160808_152311

The boom

Date: 08/09/2016
Views: 442
20160808_111852

20160808_111852

Nose size matters!

Date: 08/09/2016
Views: 486
20160811_140535

20160811_140535

Top of the main beam

Date: 08/12/2016
Views: 492
20160811_140528

20160811_140528

Main beam padeye,

Date: 08/12/2016
Views: 467
20160811_160339

20160811_160339

Rear beam assembly

Date: 08/12/2016
Views: 482
20160811_135442

20160811_135442

Long reach socket

Date: 08/12/2016
Views: 460
20160811_132058

20160811_132058

Long reach wrench

Date: 08/12/2016
Views: 430
20160811_132049

20160811_132049

Date: 08/12/2016
Views: 470
20160811_130628

20160811_130628

Reinstalling the DS tube

Date: 08/12/2016
Views: 515
20160810_175320

20160810_175320

The final solution

Date: 08/12/2016
Views: 657
first previous
Page: 1 2