Login
Albums Beachcats Technical Rebuild of NACRA 5.2 This End UP Aluminum Refinishing, Rigging Modifications and Everything Connected to the Aluminum.
Search All Albums

Aluminum Refinishing, Rigging Modifications and Everything Connected to the Aluminum.

Cleaning up, sandblasting, precoating, priming and finishing aluminum mast, beams and boom. Riveting and structural work.

Date: 06/10/2016
Owner: Dave Graf
Size: 52 items
first previous
20160801_171533

20160801_171533

Mast Base

Date: 08/01/2016
Views: 493
20160808_111747

20160808_111747

Pretty rudder castings

Date: 08/09/2016
Views: 514
20160808_152311

20160808_152311

The boom

Date: 08/09/2016
Views: 443
20160808_111852

20160808_111852

Nose size matters!

Date: 08/09/2016
Views: 488
20160811_140535

20160811_140535

Top of the main beam

Date: 08/12/2016
Views: 494
20160811_140528

20160811_140528

Main beam padeye,

Date: 08/12/2016
Views: 469
20160811_160339

20160811_160339

Rear beam assembly

Date: 08/12/2016
Views: 483
20160811_135442

20160811_135442

Long reach socket

Date: 08/12/2016
Views: 462
20160811_132058

20160811_132058

Long reach wrench

Date: 08/12/2016
Views: 432
20160811_132049

20160811_132049

Date: 08/12/2016
Views: 472
20160811_130628

20160811_130628

Reinstalling the DS tube

Date: 08/12/2016
Views: 517
20160810_175320

20160810_175320

The final solution

Date: 08/12/2016
Views: 659
first previous
Page: 1 2